B082
Station status: Operational

The Yuchengco Center

Sen. Gil Puyat Ave, Bel-Air, Makati City

Technical Specs

AC CHARGING POINTS

21

DC CHARGING POINTS

0

Power Availability

AC - 7 kW21

Charging Points

ConnectorPowerTypeCommissioned status
TYPE 27 kWAC 21 / DC 0Ready

Live connector availability may vary. Check the Evro app for real-time status.

Hold CTRL or double tap to interact
Open in Google Maps

Regional Info

Administrative Region

Metro Manila (NCR)

Island Group

Luzon